KW Default Solutions

REO field checklists

These two checklists are for agents who visit REO (real estate owned) properties, which are homes a lender or other owner took back, usually after foreclosure. One covers an incident such as damage or a suspected break-in, where safety comes first, and the other helps you compare a repeat inspection with the last record instead of copying old notes.

White farmhouse at dusk with lit windows

Incident action card

An incident at an REO property

A written response guide for unexpected damage, suspected entry and other conditions that need more than a routine property report.

Danger comes first

Call 911 if anyone may be in immediate danger. A client reporting deadline isn’t a reason to remain in danger.

1. Immediate response

Move to safety; don’t investigate or confront.
Call 911 if anyone may be in immediate danger.
Follow responding authorities’ instructions and brokerage safety procedures.
Record the observable condition and time without guessing cause or fault.

2. First report

Correct property identifier and safe contact route.
What was observed, where and when.
What is unknown or couldn’t be inspected safely.
Immediate actions, responders and reference number if available.
Current access limitation and affected scheduled work.
Specific direction needed and how to reach the responsible person.

3. Follow-through

Named decision-maker and assigned response owner.
Written authority and scope for applicable security/assessment work.
Appropriate notifications to affected authorized parties.
Completion evidence and qualified review where needed.
Explicit direction on resuming access or leaving restrictions in place.
Expense evidence and remaining open items in existing systems.
Follow-up owner and next check recorded until resolution.

Report starter

LineWhat to write
PropertyAsset identifier
ObservedDate/time and factual condition
Safety/accessActions and present limits
ResponseAppropriate agency/vendor contact, if any
EvidenceControlled file references
UnknownsItems not inspected or established
Decision neededSpecific authorized next step
Owner/follow-upAssigned person and next check

Keep the message factual. Avoid guesses about insurance coverage, liability, fault, repair cost or reimbursement.

Keep this action card with the property’s escalation contacts. Fill in the approved contact route before the next visit, while there’s time to confirm who actually handles an urgent report.

This card doesn’t replace emergency services, brokerage safety procedures, local reporting requirements or qualified technical assessment.


White colonial house with a red door and brick walk

Change-comparison checklist

Recurring REO inspections: compare the property

Don’t repeat the last report. A recurring inspection should connect today’s observations with the prior record and the client’s current instructions.

This is a visual operating review within the agent’s authorized role, not a technical building inspection, a diagnosis or proof that every system functions.

Record one of three results

  • Observed change: identify the current condition and the dated comparison that makes the change apparent.
  • No material change observed within this visit’s scope: identify what was actually observed. This isn’t a statement that the entire property is free of defects.
  • Not observed or not established: explain the access, visibility, safety or technical limit and the follow-up needed.

Use only the parts relevant to the property and authorized visit. Add actual client requirements; don’t remove a required area because it isn’t listed here.

1. Before the visit

Date, scope, reporting deadline and lawful access confirmed.
Baseline and latest report located.
Prior unresolved issues, approved work and recent events reviewed.
Coverage and safety/check-in procedure confirmed.

2. Exterior and access

Observable entry/security condition compared with prior record.
New damage, open doors/windows or signs of possible entry recorded safely.
Grounds and visible exterior conditions reviewed within the assigned scope.
Posted notices or apparent association issues recorded without deciding validity.
Pool/barrier or other visible safety concern reported without operating equipment or entering danger.

3. Authorized interior observation

New visible water, staining, deterioration or missing fixtures compared with prior documentation.
Visible condition changes recorded with context and detail.
Areas not safely accessible identified rather than marked clear.
Utility status and preservation changes checked through appropriate evidence.
No claim of system operation based only on a switch, account status or photograph.

4. Work and open items

Approved visible work compared with its written scope.
Completion evidence distinguished from request/appointment confirmation.
Prior unresolved items updated with present condition and owner.
New concerns routed to qualified assessment where needed.

5. After the visit

Dated comparison and current photographs filed securely.
Urgent matters escalated through the actual urgent route.
Routine report submitted through the required channel.
Requested decisions, responsible owners and follow-ups entered in the existing system.
Acknowledgment/decision tracked where needed; submission isn’t treated as resolution.

Keep credentials and occupant information out of a general inspection worksheet.

Example change note

(fictional)“New staining is visible on the ceiling near the rear bedroom window compared with the authorized visit record dated [date]. Current context and detail images are filed at [controlled reference]. Cause and extent haven’t been established. The area wasn’t disturbed or tested. Please confirm authorization for an appropriate qualified assessment and any interim restrictions.”

The note doesn’t identify mold, diagnose a roof leak or promise a repair. It makes the difference visible and requests the decision needed to investigate it.

KW Default Solutions. Educational checklist. Your client’s instructions control.